Hidden debts uncovered: how to identify what could block your flat conversion
Published 24 November 2026
The most common obstacles to selling flats after conversion are mortgages (zástavní práva), enforcement orders (exekuční příkazy), arrears, unsettled tenant claims, and disputes over ownership that do not appear in standard property documents. Most can be verified in advance in public registers and with authorities, and resolved before the project begins. The checklist below shows where to look for each problem and what to do if it emerges during conversion.
Summary
- Hidden encumbrances on a building can mostly be found in public registers; they just need to be collected systematically.
- The key documents are the Czech Land Registry extract (výpis z katastru nemovitostí), the Insolvency Register (insolvenční rejstřík), and the Central Register of Enforcement Proceedings (centrální evidence exekucí).
- Outside registers, look for arrears (nedoplatky), unfinished repairs, tenant claims, and disputes between co-owners.
- A problem spotted early is a matter of time and budget; a problem discovered during flat sales will halt the entire project.
- An audit and plan with a 6-week timeline includes legal due diligence, the first checkpoint.
Why building debts surface only when selling individual flats
A building's debt emerges at the latest when the buyer must take over the flat free of encumbrances. When selling a building as a whole, buyers often deduct debts from the price. With individual flat sales, this is not possible: each buyer, their bank and their lawyer all want clear ownership rights without restrictions.
This is precisely why conversion is sensitive to hidden liabilities. The typical value difference between selling the whole building and selling individual flats is +20–40%; the exact figure will only be confirmed by a feasibility study. This added value can be held up or reduced by a single unresolved encumbrance. Moreover, ownership rights do not transfer until registration in the Czech Land Registry (katastr nemovitostí), and the cadastral office must not decide before 20 days have passed since the owner has been notified (Cadastral Act No. 256/2013 Coll.). An encumbrance discovered just before registration thus means a real delay.
What to verify in public registers
You can complete the basic due diligence yourself in one afternoon, as the key registers are public.
| Where | What you will find |
|---|---|
| Czech Land Registry (Nahlížení do katastru nemovitostí) | Title deed: mortgages, enforcement orders, real burdens (věcná břemena), pre-emptive rights (předkupní práva), notes on pending disputes |
| Insolvency Register (Insolvenční rejstřík) | Whether the owner (person or company) is in insolvency and what restrictions apply (Insolvency Act No. 182/2006 Coll.) |
| Central Register of Enforcement Proceedings (Centrální evidence exekucí) | Enforcement proceedings against the owner; enforcement by sale of real property leads to public auction (Rules of Civil Procedure No. 120/2001 Coll.) |
| Commercial Register (Obchodní rejstřík) and attachments (sbírka listin) | For company owners: annual accounts, changes of directors, any liquidation proceedings |
Pay special attention to the section of the title deed showing restrictions on ownership. A mortgage or enforcement order must be resolved before selling flats, otherwise it would encumber the flats created by the division. If the extract contains a note of a dispute, check the relevant court for details.
Where debts hide outside the registers
The most dangerous are liabilities that no register shows and which lie in accounts, contracts and the building's history.
Unacknowledged and unfinished repairs
Go through work contracts, invoices and handover reports from recent years. Look for unpaid invoices, unfinished work, unsettled warranties and work that no one has formally accepted. A contractor may have a claim against the building of which you are unaware until they get in touch.
Structural alterations without permission
Loft conversions, changes to layouts or converted non-residential spaces without the necessary planning permission can block future definition of units. The procedure for building works is set out in the Building Act No. 283/2021 Coll.; you should therefore compare the actual state of the building with available plans and decisions.
Arrears and taxes
Verify that the building has no arrears on property tax, fees or services. You can request confirmation of the state of tax arrears from the Financial Administration. Tax arrears can also affect how you can deal with the property.
Tenant claims
When ownership is transferred, the new owner enters into the lease (§ 2221 of the Civil Code No. 89/2012 Coll.). Check whether tenants have made alterations for which they may have a claim for compensation, and how deposits (security) are handled. Incomplete records of deposits is a frequent and overlooked liability.
History of ownership and restitution
For buildings that were nationalised or expropriated after the war, verify the entire chain of ownership from the original owner. Unclear history, missing documents or a registered note of a dispute may concern a buyer, bank or lawyer, even if the claim has never been actively pursued.
Disputes between co-owners and heirs
If the building has multiple owners, verify who must consent to the sale and division. The general pre-emptive right of co-owners was abolished; only a six-month right remains if the share arose from inheritance (§ 1124 of the Civil Code No. 89/2012 Coll.). An unresolved inheritance proceeding or disagreement between co-owners will block the project even without a pre-emptive right.
How to proceed step by step
The most reliable approach is to work through the verification in a fixed order and record each finding with the date, source and responsible person.
- Download the current Czech Land Registry extract and read all sections of the title deed, not just the owner's name.
- Check the Insolvency Register and Register of Enforcement Proceedings for all owners and companies in the ownership structure.
- Request confirmation of arrears from the Financial Administration and the local authority.
- Compile a list of work contracts, invoices, warranties and unfinished repairs.
- List the tenants, the amount of deposits and any alterations made to the flats.
- Compare the actual state of the building with the documentation and building permits.
- Verify the chain of ownership and any unresolved inheritance or disputes.
The tax implications of the sale, such as the time test or conditions for exemption for principal residences, depend on each owner's situation. Assess these with a tax advisor or the Financial Administration (Income Tax Act No. 586/1992 Coll.).
What to do if a debt emerges during conversion
An identified debt does not have to stop the project if it is named, quantified and has a solution before the next checkpoint. The project goes through three checkpoints (legal, permit, sales gate) and you only move to the next phase with confirmed figures. This is exactly what this process is designed for.
- Mortgage: agree with the lender on partial release or settlement from the proceeds of the flat sales, or earlier settlement.
- Enforcement and insolvency: negotiate with the bailiff or insolvency administrator; dealings with assets are restricted and require their cooperation. Do not wait for a public auction, where the opening bid is two-thirds of the expected price (§ 336e of the Civil Procedure Code No. 99/1963 Coll., applied by analogy for enforcement proceedings).
- Arrears and liabilities to suppliers: quantify them, agree on instalments or settlement and factor this into the budget.
- Disputes: distinguish whether only one flat or the entire building is disputed; in some cases, you can proceed with other units.
What matters is whether the increased costs or time delay still make sense against the added value of selling individual flats. This will be shown by the recalculation after the legal checkpoint, not an estimate.
What to do now
Start with the Czech Land Registry extract, the registers and a collection of contracts and invoices, and only then tackle price and timescale.
Prepare the title deed, a list of tenants and deposits, work contracts, available project plans and confirmation of arrears. You can calculate the building's indicative potential using the potential calculator. Legal due diligence as part of a paid feasibility study is provided by Audit and Plan, with output within 6 weeks. Further information can be found in the frequently asked questions and on the blog.
Get a non-binding offer or property assessment via the form below the article.