How to stay living in a block of flats during renovation when you own one unit
Published 12 November 2026
An owner living in their own flat can stay during renovation, but only if their living space is included in the work schedule and safety measures from the very start. As an owner you do not have tenant status, so tenant protections do not apply to you—but nor is anyone obliged to provide accommodation; this must be arranged separately. The most reliable approach combines staged works, a written agreement with the investor, and possibly temporary accommodation elsewhere during the noisiest phases.
Summary
- An owner of a unit is not a tenant: their rights stem from ownership and the Czech Civil Code No. 89/2012 Coll., not from a rental contract.
- Safety, noise and dust are managed through a schedule, zone separation and written agreement—not verbal promises.
- For the noisiest phases, temporary accommodation elsewhere is often practical, for example by renting out your own unit or another flat.
- The strongest starting position comes from being involved in the transformation plan before construction begins.
- Next step: write down your living requirements and submit them via the form below for assessment.
What legal position does a resident owner have?
An owner living in their own unit has a stronger position than a tenant, but their right to quiet enjoyment and safety is not automatic. A tenant relies on a rental contract; you rely on ownership rights and the rules governing shared ownership of the building.
Practical consequence: if an investor, another owner or the owners' association plans building works to common areas, the decision is made under the Czech Civil Code No. 89/2012 Coll. and according to the building rules or owner's declaration. Your voice, or indeed your consent, may be a condition. At the same time, you cannot expect construction to stop for your comfort if it is being carried out in accordance with the permit.
It is therefore sensible not to approach matters confrontationally but to agree conditions under which you will live. The sooner, the better.
What actually threatens living conditions during construction?
The main risks are noise, dust, restricted access to the building and loss of services, not the construction itself. Each can be described and limited in advance.
- Noise and vibration: demolition of partitions, drilling into load-bearing structures, ceiling replacement.
- Dust and dirt: spreads via stairs, lift shafts and service ducts.
- Access and evacuation: blocked corridors, scaffolding at windows, sealed stairwells.
- Loss of utilities: water, electricity, gas, heating during pipe replacement.
- Personal safety: movement of workers in the building, unsecured openings, material storage.
The builder's and contractor's obligations during construction follow from the Building Act No. 283/2021 Coll. and from occupational safety regulations. As a resident you have the right to insist that safe escape routes are maintained and the building site is separated from inhabited areas.
How to ensure safety and reasonable peace of mind in your home
Safe living during construction is possible if the work is staged and the inhabited part is physically separated from the building site. The usual approach is:
- Staging: work is planned in phases so your unit does not suffer noise loss of services and restricted access all at once.
- Zone separation: closed building sites, dust-proof barriers, marked and clear escape routes.
- Operating rules: hours for noisy work, cleaning of common areas, access by workers only.
- Notice of service loss: in writing and in advance, with agreed alternative arrangements, for example water access elsewhere.
- Single point of contact: one designated representative of the investor you can contact if problems arise.
Do not rely on verbal assurances for these points. They should be in a written agreement you can refer to later.
When is it better to relocate temporarily?
For the noisiest and dustiest phases, temporary accommodation outside the building is often the simplest and safest solution. This applies particularly to ceiling replacement, pipe work, service upgrades and works directly in your unit.
Options to consider:
- Renting out your unit: you let it for the duration of construction and live in another flat. Income from rental is subject to the Czech Income Tax Act No. 586/1992 Coll.; check the details with the Tax Office or a tax adviser.
- Temporary rental elsewhere: short-term rental of a flat locally, or possibly with family.
- Agreement with the investor: the investor may, by agreement, contribute to alternative accommodation or provide it; but this is negotiable, not a legal right.
Consider also taking only a short-term lease matching the duration of a specific phase. Rental is governed by the Czech Civil Code No. 89/2012 Coll.
Aligning with the transformation plan
The strongest position for a resident owner arises when their unit is part of the transformation plan, not merely a side effect of the works. Conversion of a block of flats into individually sold units follows phases and three gates: legal, permit and sales gate. Progress to the next phase occurs only with confirmed numbers. More information in the overview How it works.
For you this means when and how your unit will be affected can be determined in advance. Possible options:
| Option | What it involves | What to watch |
|---|---|---|
| Stay living throughout | Staging, zone separation, operating rules | Noise and dust; everything in writing |
| Temporary accommodation elsewhere | Rent your unit or another flat for the phase duration | Duration and conditions of return |
| Joining the project | Your unit becomes part of the plan, possibly for sale | Unit changes, registration proceedings |
If it is worthwhile to sell the unit in due course, remember that ownership rights pass only upon registration with the Czech Land Registry (Katastr nemovitostí) under the Land Registry Act No. 256/2013 Coll. The Land Registry office cannot decide until twenty days after notifying the owner. The project scope and owner roles are also covered by End-to-end delivery, where everything is managed under one contract.
What to agree in writing before construction starts
An agreement with the investor should address everything affecting your living before works begin. Recommended contents:
- schedule of phases highlighting works affecting your unit,
- rules for noise and working hours,
- maintaining access and escape routes,
- notice of service loss and alternative arrangements,
- responsibility for damage to your unit and contents,
- procedure for complaints and contact person,
- possible contribution to temporary accommodation or terms for renting out your unit.
Before signing, we recommend consulting a lawyer; the Czech Bar Association maintains a list of solicitors.
What to do now
First prepare your documentation and requirements, then approach the investor. Specific steps:
- Write down what adequate living means for you: who lives in the unit, whether there are children, elderly people or home-working.
- Prepare an extract from the Czech Land Registry (Katastr nemovitostí), the owner's declaration and any building rules.
- Find out what the plan for the building is and what phase it is at.
- Decide whether you prefer to stay, relocate temporarily, or sell your unit as part of the project.
- Send us this information via the form below.
You will receive a non-binding assessment via the form. The decision remains yours.