Tenants and Building Conversion: How to Communicate to Avoid Obstruction
Published 25 November 2026
Tenants typically do not obstruct changes if they receive timely, accurate information, understand what affects them, and have one designated contact person. The best strategy is stepwise communication aligned with project phases—first verbally, then in writing—without making promises you cannot keep. Below you will find a communication timeline, message templates, and guidance for handling objections.
Summary
- Inform tenants progressively according to project phases, not all at once and not too early or too late.
- Tenancy continues through change of ownership (§ 2221 of the Civil Code No. 89/2012 Sb.—Czech Civil Code), which is the most reassuring argument.
- Communicate every important matter first in person or at a meeting, then confirm it in writing.
- Never promise what you cannot deliver; for timelines and conditions, use only confirmed data.
- Record objections and respond to them factually, not through pressure or threats of termination.
Why Communication with Tenants Is Part of the Project Economy
Unhappy tenants can delay and increase project costs, so communication should be a line item in your budget alongside permits and professional fees.
Selling a building unit by unit can typically generate 20–40 per cent more value than selling the entire building, depending on a feasibility study. This potential is lost if buyers encounter conflict during viewings or if the building is blocked by dispute. Tenants also know what is happening in the building, and if they don't hear from you, they will fill in the blanks themselves.
An owner who lives in the same building has the advantage of personal contact but also the risk: every careless word in the hallway is treated as official communication. So decide in advance who will say what, and in what form.
The Legal Framework You Can Rely On
Tenancy does not automatically terminate upon conversion, and this is what needs to be clearly explained to tenants.
- Upon transfer of ownership, the new owner enters into the rights and obligations of the landlord (§ 2221 of the Czech Civil Code—Občanský zákoník č. 89/2012 Sb.). The tenancy agreement therefore remains valid.
- A landlord can terminate tenancy only for reasons specified by law (§ 2288 of the Czech Civil Code). The plan alone to divide the building or sell units separately is not, by itself, a valid ground for termination without further justification.
- Ownership of a unit passes to the buyer only upon registration in the Czech Land Registry—Katastr nemovitostí (under the Land Registry Act No. 256/2013 Sb.—Katastrální zákon). Until then, nothing changes in the relationship with tenants.
- Building works and their permits are governed by the Building Act No. 283/2021 Sb.—Stavební zákon.
Always verify your specific situation with a lawyer, especially if any agreement contains special terms or if you are considering terminating tenancy by mutual consent. The text of the law can be found in the legal database.
Communication Timeline: What to Tell and When
Information should follow the individual steps of the project, so tenants never learn important news last.
| Phase | What to Communicate | Form |
|---|---|---|
| Before audit | The owner is considering the building's future and commissioning an assessment. Nothing is changing yet; tenancy agreements remain in force. | Brief personal conversation, followed by letter or email |
| After audit and plan | Whether the project is proceeding, the anticipated timeline, what affects tenants and what does not. | Tenant meeting, followed by written summary |
| Before construction works | Scope of work, timeline, limitations (water, lift, noise), contact for the responsible person. | Written notice and bulletin board; individual discussion for work in units |
| When dividing and selling units | That tenancy continues after the owner changes, how viewings will be conducted, who will be their landlord. | Individual letter and personal consultation |
| Upon formation of a homeowners' association | What the association means for building operations and payments, who the manager will be. | Information meeting and written summary |
Provide timelines only when confirmed. A project passes through three gates (legal, permit, sales), and you advance only with confirmed figures. This is a good rule for communication too: don't commit to a date you don't yet know. An overview of phases is available on the How It Works page.
Message Templates Without Legal Risk
A good message is brief, specific, and contains no commitment or threat.
First message template (before audit)
Good day, I wanted to inform you that I am commissioning an assessment of the building's future options. This is a preliminary analysis; I do not yet know the outcome. Your tenancy agreement remains valid and unchanged, and your rent will not change as a result of this study. Once the assessment is complete, I will personally discuss the next steps with you. Please feel free to contact me with any questions.
Message template before construction
Good day, building works will be carried out as follows: [description]. The anticipated start date is [date confirmed by contractor]; the interruptions will affect [water / lift / courtyard]. You will be notified before each disruption. Your point of contact is [name, phone number]. If work will be carried out in your unit, we will arrange a time individually.
Message template when dividing the building
Good day, the building will be divided into individual residential units. Your tenancy agreement will remain valid even if the owner of your unit changes (§ 2221 of the Czech Civil Code—Občanský zákoník). You will be informed promptly of all steps. If you have questions, we will meet in person.
Do not include price estimates, promises of permanent tenancy, or phrases like 'you have nothing to worry about'. Factual communication works better than reassurance.
How to Address Objections and Concerns
Objections are best heard, documented, and answered in writing, because most arise from uncertainty rather than resistance.
- Listen without defending. Ask what the tenant fears: rent, noise, moving, costs.
- Separate facts from assumptions. Tell precisely what applies under the contract and law. Admit what you don't yet know.
- Write down the question and agree on a reply date. Keep to the deadline.
- Confirm in writing. A short email summarising the conversation prevents misunderstanding.
- Offer a concrete solution where possible. For example, an alternative construction schedule or an alternative means of access.
- Conduct negotiations about ending tenancy only voluntarily and by written agreement after legal review. Pressure, interrupting services, or repeated threats of termination lead to dispute.
If a tenant breaches the contract, that is a separate matter to be handled under the Czech Civil Code (Občanský zákoník č. 89/2012 Sb.) and with legal counsel, not as part of the conversion communication.
Common Mistakes by Owners Living in the Building
Most conflicts arise not from the substance of the project but from informal and inconsistent communication.
- Information given 'in the hallway' without written confirmation, which everyone then interprets differently.
- Different answers to different tenants.
- Too much information too early, before anything is confirmed, or silence until work begins.
- Promises about price, duration of tenancy, or future sale that you cannot guarantee.
- Mixing roles: owner, neighbour, and negotiator in one person. It is useful to designate one contact person.
If you are managing the project with a partner, agree in advance on who communicates. With End-to-end delivery, a communication plan is prepared as part of project management; with Partnership / JV, you must agree on who has the final say in tenant communications.
What to Do Now
Before your first announcement, prepare your materials and communication plan, because changing first impressions is difficult.
- Compile a list of all tenancy agreements: duration, termination conditions, special terms, payments.
- Designate a contact person and communication method (email, phone, meeting).
- Prepare a timeline using the table above and populate it only with confirmed dates.
- Draft your first message and a list of anticipated questions.
- Have your texts reviewed for legal compliance, especially if you are considering mutual termination agreements.
If you want to understand project economics before approaching tenants, an audit and plan (paid feasibility study) deliver results within six weeks. You can request a non-binding offer or building assessment through the form below this article.