Which Building Works in Units Must Be Completed Before Filing the Declaration of Ownership
Published 19 November 2026
Before filing a Declaration of Ownership, each unit must be clearly defined both structurally and legally: the actual condition must match the documentation, and the building must be properly registered in the Czech Land Registry (katastr nemovitostí). The law does not prescribe a uniform "minimum standard" for apartment fixtures; what matters is whether the actual state matches the documentation, whether alterations are legal and documented, and whether they meet the requirements of potential buyers and lenders. This checklist shows what should be completed and documented for each unit.
Summary
- The Declaration of Ownership (§ 1166 onwards of the Civil Code No. 89/2012 Coll.) requires clear definition of units and common parts in accordance with the actual state of the building.
- The law does not prescribe apartment fixtures, but illegal or undocumented alterations are the most common obstacle to dividing the building.
- Each unit must have separately metered and disconnectable utilities, defined boundaries and access from common parts.
- Any alterations requiring a process under the Building Act (Stavební zákon) No. 283/2021 Coll. must be completed and legalised before the building is divided.
- The sequence of steps and their costs should be verified by audit and plan, not by desk estimate.
What the Law Requires and What It Does Not
The law does not require any specific fixtures or finishes in an apartment before declaring ownership; it requires precise definition of the unit and compliance with reality.
The Civil Code (Občanský zákoník) No. 89/2012 Coll., §§ 1159 onwards, defines a unit as an apartment or non-residential space identified in the declaration; §§ 1166 onwards set out the content of the Declaration of Ownership, including attachments with floor plans. It does not specify whether an apartment must have a bathroom or what windows it needs. The practical problem arises elsewhere: if the actual layout differs from the documentation, you will describe something in the declaration that does not physically exist, leading to disputes with buyers.
Therefore, the quality and standard of apartments are assessed primarily by buyers, their lenders and expert surveyors. This factor determines saleability and price far more than the mere registration.
Checklist 1: Building Condition and Registration in the Land Registry
First, the building as a whole must be in order; only then does it make sense to address individual apartments.
- The building is registered in the Czech Land Registry (katastr nemovitostí) as a structure with appropriate description and stands on a plot owned by the same owner (otherwise the plot must be dealt with separately).
- The registered use and number of storeys match the actual state.
- Any mortgages, easements (věcná břemena), enforcement orders or other registrations on the building are recorded; each must be resolved or verified for impact on the units.
- The building is structurally complete; any additions, extensions or loft conversions have documented permission or completion certificates (kolaudace).
- Building and technical documentation is available; if not, obtain a measured survey of the actual condition.
The detailed procedure for registration is set out in the Land Registry Act (Katastrální zákon) No. 256/2013 Coll.; ownership rights arise only upon registration (vkladem) and the land office cannot decide before 20 days from notification of the owner.
Checklist 2: What to Verify in Each Unit
Each unit must be independently identifiable, accessible and technically separate.
| Area | What to Verify | Typical Issue |
|---|---|---|
| Boundaries | Unit boundaries (walls, ceilings, floors), doors to common parts | Unit is a thoroughfare or encroaches on neighbouring unit |
| Layout | Actual state matches the floor plan | Alterations, moved partition walls, added storage |
| Ancillary spaces | Cellar, attic storage, balcony clearly assigned | Cellars used without formal assignment |
| Utilities (electricity, water, gas, heating) | Separate meters or possibility of installation | Shared circuit or single meter for multiple units |
| Waste and chimneys | Functional risers, exhaust ducts, boiler inspections | Missing inspections, unauthorised appliances |
| Sanitary facilities | Private toilet and bathroom within the unit | Shared toilet in corridor |
Shared facilities or missing bathroom do not prevent sale, but will significantly affect price and lender willingness to finance purchase; decide with a cost-benefit analysis.
Checklist 3: Legalising Alterations and Documentation
Alterations carried out without the required permission must be legalised before they are incorporated into the declaration.
Whether an alteration requires permission, notification or another process is determined by the Building Act (Stavební zákon) No. 283/2021 Coll. and implementing regulations. Generally, works to load-bearing structures, changes of use or alterations to external appearance are more sensitive than flooring replacement or refurbishment. Assess your specific case with the relevant building authority (stavební úřad) or a designer.
Before filing, prepare for each unit:
- current floor plan based on the actual state, with room labels and areas,
- documentation of building works performed (permits, completion certificates or consents),
- inspections of electrical, gas and chimney systems,
- schedule of rental agreements and occupancy status,
- photographic record of condition.
What Lenders and Surveyors Will Require
Lenders do not assess apartment standard according to law, but according to surveyor valuations and legal title clarity.
Buyers purchasing an apartment with a mortgage typically need the unit to be a separate real property registered in the Land Registry, to be free of mortgages or for mortgages to be discharged from the purchase price, and for the valuation to match the actual condition. Specific requirements vary between lenders, so verify them in advance, not when the first buyer appears. Layout discrepancies, unauthorised alterations or unclear co-ownership are typical causes of delay.
Therefore, plan building works so their results can be documented and supported by a professional valuation report. The scope of investment is not determined by law but by economics: the typical difference in value between selling a whole building and selling by units is +20–40%, with the precise figure determined by feasibility analysis. Works are worthwhile only where the increase in value exceeds the cost.
What to Do Now
Begin with an inventory of the building and units; only on this basis decide what works are needed.
- Request a current extract from the Czech Land Registry and verify the registrations on the building and plot.
- Collect plans, completion certificates and inspection reports; survey missing documents or commission one.
- Go through each apartment using the table above and record any deviations from the documented layout.
- Categorise findings: those that necessarily block the declaration versus those affecting price only.
- Have the costs calculated and the impact on unit prices assessed.
This is what audit and plan addresses, delivering results within six weeks. The complete procedure, including project gates (legal, permit, sales gate), is described on the How it works page; proceed to the next phase only with confirmed figures. Get a non-binding offer or building assessment via the form below the article.