Energy Performance Certificate and residential building conversion: what you need to arrange and how long it takes
Published 15 November 2026
The Energy Performance Certificate (EPC) is a standard requirement when selling flats in the Czech Republic and will not delay the sale if arranged in time alongside other preparations. An authorised energy specialist prepares it, and this work can proceed in parallel with legal and construction preparations. The main risk is ordering it too late rather than the certificate itself presenting any problems.
Summary
- The obligation to provide an Energy Performance Certificate when selling a building or flat unit stems from Act No. 406/2000 Sb. (Energy Efficiency Act); exemptions and details vary, so verify current requirements with an energy specialist.
- An authorised energy consultant prepares the certificate; the time it takes depends mainly on gathering building documentation, not on the calculation itself.
- The certificate is not on the critical path of conversion, so order it in parallel with other preparation work.
- An audit and plan will clarify the scope of required documents and timing; the output is available within six weeks.
Is the energy performance certificate mandatory when selling flats?
In principle, yes: the Energy Efficiency Act (Act No. 406/2000 Sb.) requires the seller to provide the buyer with an Energy Performance Certificate (EPC) when selling a building or individual flat unit, subject to certain statutory exemptions.
In practice, this means the buyer has a right to receive the certificate, and the seller must have it ready. Exemptions and exact conditions change over time, so before selling, verify the current requirements in the law or with an energy specialist.
It is important to understand that the certificate normally applies to the building as a whole, or sometimes to a self-contained part of it. For a residential apartment building, a separate certificate is often not created for each flat; instead, the certificate for the whole building is used. Whether this is possible in your case will be assessed by the specialist based on the heating system and building layout.
What specifically do you need to obtain and who to contact
You need one document — the Energy Performance of Building certificate — and one specialist: an authorised energy consultant.
The process typically works as follows:
- Choose an energy consultant with valid accreditation, which they should produce on request.
- Gather information about the building: available design documentation or plans, heating and hot water systems, windows, roof and external walls, and details of any later refurbishments.
- The consultant will inspect the building and assess its current condition.
- The consultant prepares the calculation, assigns the building to an energy performance class, and issues the certificate with a written report.
- Keep the certificate in the building's documentation and provide it when selling the units.
The certificate is only part of the preparation. To convert the building into flats, you will also need legal and construction documentation, which is described on the How it works page.
How long does the preparation take
It is difficult to give a precise timeframe because it largely depends on how quickly you can gather information about the building and the consultant's availability.
The time breaks down into three parts:
- Building documentation: for older residential buildings, documentation is often incomplete and may need to be traced or replaced by a new survey.
- Inspection and calculation: this is specialist work, which for a typical building is usually the quicker step.
- Consultant availability: timescales vary depending on region and season.
For comparison, registration of ownership in the Czech Land Registry normally takes about 22 days, and the Land Registry office cannot decide before 20 days have passed since the owner is notified, under the Land Registry Act (Act No. 256/2013 Sb.). These timescales are more significant for the timing of sales than the certificate itself.
Does the certificate really delay sales?
If properly scheduled, the certificate will not delay the sale because no other conversion steps depend on it.
Delays typically occur in three situations:
- the certificate is ordered only when the buyer is ready to sign the contract,
- building information is missing and has to be found or surveyed,
- the building undergoes renovation and the certificate needs to be updated.
In our process, projects go through three gates (legal, permit, sales gate), and you only move to the next phase once you have confirmed figures. We therefore schedule the certificate so it is ready by the time flat sales begin, not during buyer negotiations.
How the certificate affects price and building works
The energy performance class does not in itself determine whether a building can be divided into flats, but it may affect buyer interest and price.
The typical uplift in value from selling a building as a whole versus selling flats individually is 20–40%; the exact figure depends on feasibility. A poorer energy class may be one of the factors in the calculation, for example as the cost of improving insulation or replacing windows. Whether such investment is worthwhile is an economic question for the specific building.
If you are planning building works, these are regulated by the Building Act (Act No. 283/2021 Sb.). After significant refurbishment, have the certificate prepared or updated after completion so it reflects the actual condition.
You can get an indicative estimate of the uplift from converting the building into flats using the building potential calculator.
What to do now
The sensible approach is to find out what is missing in your building before you start selling flats.
- Gather what you have about the building: extract from the Czech Land Registry, plans, refurbishment documentation, heating and energy consumption information.
- Check whether a valid certificate already exists for the building and what its validity period is.
- Note down any planned building works, as these will affect the certificate timetable.
- Have the building's overall readiness assessed as part of an audit and plan, the output of which is available within six weeks and which will also show which documents need to be completed.
You can request a non-binding quote or assessment via the form below the article. Further answers are also available in our frequently asked questions.