Tenant without a contract in your building: how to handle it so conversion stays on track
Published 24 November 2026
A tenant without a written contract cannot be evicted by self-help measures; the legal options are an exit agreement, notice to quit (if tenancy has been established), or an eviction claim and enforcement. First, you must determine whether an oral lease exists or whether the occupant has no legal right to be there. The procedure, length of proceedings and risk of delaying the entire conversion depend on this distinction.
Summary
- A written contract is not a requirement for a tenancy to arise; long-term occupation with regular rent payments may constitute a valid lease even without a written document.
- Self-help eviction, changing locks or cutting off utilities are unlawful and may harm the owner (section 14, Civil Code no. 89/2012).
- An agreement is typically the quickest and cheapest option; court proceedings offer stronger legal certainty but are harder to predict in terms of time.
- A buyer of a unit typically assumes the tenancy (section 2221, Civil Code), so an occupied unit reduces saleability.
- The status of the unit must be resolved at the legal stage of the project, not when selling.
First, establish whether a tenancy exists or whether the occupant has no legal right to occupy
What matters is whether a tenancy has been established between you and the occupant, as everything else follows from this.
The Civil Code (no. 89/2012) does not require a tenancy of a flat to be in writing. If a person occupies the flat with your knowledge on a long-term basis and makes regular payments, this may constitute an oral lease. In such cases, you cannot demand eviction merely because there is no written document.
A different situation arises where a person has remained in the flat after an earlier right ended, following the death of the original tenant, or without any agreement. In such cases, the occupancy may be without legal title.
The documents that will determine the outcome:
- bank statements and receipts for rent payments or service charge payments,
- emails, messages and other correspondence about the tenancy,
- handover protocols or utility meter readings,
- registered residence records at the address,
- history of occupation and relationship to the original tenant.
Self-help is the owner's most common mistake
Changing locks, cutting off water or electricity or removing belongings without a court order will usually harm you more than the tenant.
The Civil Code allows self-help only in exceptional circumstances where an unlawful interference is imminent, and never as a routine means to regain possession of a flat. Moreover, a tenant or occupant without a contract may invoke protection of possession (section 987 et seq.). The dispute can then turn against you and you may find yourself on the defensive, facing claims for damages.
In practice: delays usually lengthen rather than shorten.
Option 1: An exit agreement
A written agreement is usually the quickest way to regain vacant possession and, with good preparation, the most cost-predictable.
An occupant without a contract often seeks certainty rather than confrontation – specifically, where to move and when. The owner can offer a move-out date, contribute towards moving costs or help find alternative accommodation. The parties negotiate the terms themselves.
- Establish the facts (payment history, who is living in the flat).
- Propose a specific date for vacation and return of the flat.
- Close the agreement in writing, signed by both parties, settling any arrears and returning keys.
- Document the handover with a protocol and final meter readings.
Note the daily cash payment limit of CZK 270,000 under the Financial Administration Act (no. 254/2004); bank transfer is preferable.
Option 2: Notice to quit or an eviction claim
If an agreement fails, court proceedings are the remaining option, with the type depending on whether a tenancy has been established.
| Situation | Procedure | Key risk |
|---|---|---|
| Tenancy has been established (even orally) | Notice to quit on statutory grounds only (sections 2285 et seq., especially 2288, Civil Code); eviction claim if disputed | The grounds for notice must be provable; formal defects invalidate the notice |
| Occupation without legal right | Warning to vacate, followed by claim for recovery of possession under property rights law (section 1040, Civil Code) | Occupant may argue that a tenancy arose; dispute shifts to proof |
| Judgment obtained but not complied with | Enforcement by judicial eviction (under Civil Procedure Code no. 99/1963) or bailiff enforcement (under Enforcement Code no. 120/2001) | Further time delay; must address the contents of the flat |
You may also claim restitution for use of the flat as unjust enrichment (section 2991, Civil Code), but this is a separate claim and recovery is not certain.
How long does it take, what does it cost, and how much time can you afford to lose
The length and cost of court proceedings cannot be reliably predicted in advance, so budget for them as a contingency, not as a fixed figure.
Duration depends on court workload, complexity of evidence, possible appeal and enforcement. Costs include court fees, legal representation and later bailiff fees or court enforcement costs. If you succeed, you can claim recovery of legal costs, but this is not guaranteed.
When planning a conversion, we therefore recommend:
- resolving tenancy issues at the legal review stage of the building, not just before selling units,
- factoring in the possibility that the unit may be excluded from the first tranche of sales,
- phasing sales so that an occupied unit does not hold up the rest of the project.
A project progresses through three gates (legal, permit, sales gate) and moves forward only with confirmed figures. Uncertain unit status therefore belongs at the legal gate. This process is described on the How it works page.
What an occupied unit means for sales and property value
An occupied unit sells poorly because the buyer typically assumes the tenancy as well.
On transfer of ownership, the buyer assumes the rights and obligations of the lease (section 2221, Civil Code). Title passes only upon registration in the Czech Land Registry (Katastr nemovitostí); the registry office cannot act before 20 days after notifying the owner (Land Registry Act no. 256/2013) and average registration takes roughly 22 days. A disputed unit can complicate matters, as both buyer and lender want clarity.
The typical value difference between selling a building as a whole and selling by unit is +20–40%; the precise figure comes from the feasibility study. An unresolved tenancy can reduce this potential, so its impact belongs in the calculation. As a guide, use the building potential calculator.
What to do now
Start by gathering documents and obtaining a legal assessment of your relationship with the occupant; only then choose between negotiation or court action.
- Document the history of occupation and gather proof of payments.
- Check the Land Registry extract and any mortgages or other rights encumbering the building.
- Avoid pressure tactics; instead, make a written offer to discuss a move-out date and terms.
- Obtain legal advice on whether a tenancy has arisen, then choose between notice to quit or litigation.
- Include the unit in the project timeline as a separate risk factor.
Legal assessment of the building's condition is part of the paid feasibility study Audit & Plan, with results delivered within 6 weeks. A non-binding offer or assessment is available through the form below the article. For more answers, see Frequently Asked Questions.