Činžáky.com Potenciál domu zdarma

How to Find Your Shares and Units in Your Apartment Building's Land Registry Extract

Published 19 November 2026

Your share of the building's common parts is recorded on the ownership document (list vlastnictví), which is publicly available in the Czech Land Registry (Katastr nemovitostí). If the building is divided into separate units, each unit has its own stated share; if it's not yet divided, you hold a co-ownership share in the whole building and land. This guide shows you what documents to download, where to find the information on the ownership document, and how to read it before planning a conversion.

Summary

  • Start with the current ownership document for the building and land, plus—if the building is divided—the owner's declaration (prohlášení vlastníka) from the collection of deeds.
  • The share of common parts is recorded as a fraction and derives from the owner's declaration under the Civil Code § 1166 onwards.
  • Check mortgages, easements, and notes too—they affect whether and at what cost you can sell units.
  • Spot gaps between the Land Registry records and the actual state before conversion begins, not when selling.

What to download from the Land Registry

You need the ownership document for the building, the ownership document for the land, and any deeds it references. Property records are maintained by the Czech Land Registry under Act No. 256/2013 Coll. and are accessible to the public.

  • Ownership document for the building – if the building is not yet divided, there is one document; if it is divided, there is a separate document for each unit plus one for the building as a whole.
  • Ownership document for the land – the plot is usually registered separately, and its ownership structure may differ from that of the building.
  • Owner's declaration – if the building is already divided into units, you will find this in the collection of deeds. It defines what is a unit, what are common parts, and what each share is.
  • Extract from the land register map – shows the building's location and the plot boundaries.

For a quick overview, free access to the online Czech Land Registry is sufficient. If you need a certified extract—for example for dealing with a bank or authority—request one from the Land Registry office or through a public administration contact point.

Where to find the information on the ownership document

Shares and units are spread across several sections of the ownership document, and only by reviewing them together do you get the full picture.

  1. Section A – owners and other rights holders. Shows who owns the property and, if there are multiple owners, the size of each co-owner's share as a fraction.
  2. Section B – properties. For the building you will find its type and use; for the land, the parcel number and category. For units, you will see the unit number, use type (flat, non-residential space), and share of the building's common parts.
  3. Section B1 – other properties or rights linked to ownership. This might include, for example, a connection to the land plot or associated rights.
  4. Section C – restrictions on ownership. Lists mortgages, easements, pre-emptive rights, and bans on sale.
  5. Section D – notes and other entries. Usually warnings about ongoing proceedings, such as enforcement action or insolvency.
  6. Section E – how the ownership was acquired. States the legal reason for acquisition and refers to the supporting deed, such as a purchase contract or inheritance decision.

To keep things clear, copy the unit numbers, owners, and shares into a single table.

How to read your share of common parts

The share of common parts is a fraction that, for a divided unit, forms an inseparable part of your ownership right in that unit. The legal framework is set out in the Civil Code (Act No. 89/2012 Coll.) § 1158 onwards (ownership of flats and non-residential units) and the owner's declaration in § 1166 onwards.

When reading your share, check three things:

  • Total of shares. All the shares in the building's units should add up to 1 (or 100%). If they don't, there is an error in the declaration or the register that must be corrected.
  • How the share is calculated. The owner's declaration explains what basis is used. Usually it is the proportion of floor area or the value of the unit. Compare the fraction with the actual areas shown in the building documentation.
  • Difference between co-ownership and unit ownership. In an undivided building, a fraction represents a share in the whole property; in a divided building, it represents the share of common parts alongside your separate ownership of the unit itself.
SituationWhat appears in the Land RegistryWhat it means
Undivided apartment buildingOne document for the building, owners listed with fractionsUnits do not yet exist in law
Divided buildingSeparate document for each unit, showing share of common partsEach unit can be sold separately
Different owners of building and landSeparate ownership documentsOwnership must be aligned before division

Watch out for restrictions and notes

Mortgages, easements, and notes about legal proceedings can determine whether and under what conditions you can sell units.

  • Mortgage held by a bank or other creditor over the whole building must be addressed when dividing it, for example by releasing each unit from the mortgage.
  • Easements—such as a lifetime right of residence or a right of way—usually pass to new owners and reduce the unit's usability.
  • Enforcement action and insolvency appear in the Land Registry as a note. The legal framework is the Enforcement Procedure Act (Act No. 120/2001 Coll.) and the Insolvency Act (Act No. 182/2006 Coll.). The owner's power to dispose of the property may be limited.
  • Co-ownership from inheritance. General pre-emptive rights for co-owners no longer apply; they were abolished in 2020. If you acquired a share by inheritance, pre-emptive rights last only six months from the date co-ownership arose (Civil Code § 1124).

For later sale, note also that ownership of a property only arises once it is registered in the Land Registry. The Land Registry office cannot decide before 20 days after notice to the owner and the average registration time is roughly 22 days. Plan for this delay when scheduling the unit registration.

Why shares and units matter for your conversion project

Properly documented shares form the basis for calculating how much your building will make after unit sales. The typical value uplift when selling divided units rather than the whole building is roughly +20–40%, but the exact figure depends on a feasibility study of your specific building.

Land Registry data is used several times throughout the project:

  • in the legal review of ownership, mortgages, and restrictions;
  • in drawing up the division—deciding which units exist and what their shares are in the owner's declaration;
  • in preparing the sale, when buyers and banks require a clear ownership document.

A building conversion project goes through three gates (legal, permit, sales) and you only progress to the next stage with confirmed figures. Land Registry verification is part of the first gate. The building part—changes of use and permits under the Building Act (Act No. 283/2021 Coll.)—comes next. For more on how conversion works, see our overview. Try a rough estimate in our building potential calculator.

Tax implications of sale—such as the effect of holding period or residential use—are governed by the Income Tax Act (Act No. 586/1992 Coll.). Check your specific situation with the tax authority or a tax adviser.

What to do now

Start by downloading the ownership documents and comparing them with your building's actual state.

  1. Download the current ownership documents for the building and all plots of land beneath it.
  2. If the building is already divided, find the owner's declaration and its attachments in the collection of deeds.
  3. Create a table of units, owners, and shares, and check that the shares add up to 1 (or 100%).
  4. Write down mortgages, easements, and notes from sections C and D.
  5. Compare what the Land Registry shows with rental agreements and how the spaces are actually being used.

If you want an economic and legal review of this information, our Audit & Plan service provides a paid feasibility study with results within six weeks. For more answers see our frequently asked questions. Get a non-binding offer or assessment of your building through the form below this article.

Frequently asked questions

Where do I find the share of common parts? +

In section B of the unit's ownership document, where the share is shown as a fraction. How it is calculated is explained in the owner's declaration, which is kept in the Land Registry's collection of deeds.

Must I pay for a Land Registry extract? +

Free online access to the Land Registry is enough for basic information. A certified extract with legal effect—which banks and authorities require—is paid. See the current fee schedule at the Czech Office for Surveying, Mapping and Cadastre.

What if the shares in the building don't add up to 1? +

There is a defect in the owner's declaration or the Land Registry entry. It must be corrected before selling units, usually requiring legal advice and possibly a fresh entry in the Land Registry.

Do shares matter in an undivided apartment building? +

Yes. In an undivided building, the fractions determine each co-owner's share and therefore who must consent to the building being divided into units and to the sale.

Need a free, no-obligation assessment of your situation?

Use the form on our website — it is in Czech, but you can write to us in English.

Get an assessment

More articles

Potenciál domu Zavolat