The buyer's surveyor and flat defects: what stops the sale
Published 18 November 2026
Most apartment sales are stopped by defects whose scope and repair cost the buyer cannot assess: active damp, missing or unreliable electrical protection, and damage to common building parts, particularly the roof and water risers. Defects with a clearly calculable repair cost—such as windows or finishes—are usually resolved through price adjustment. If you as the owner know the survey results before the buyer, you can choose which defects to repair and which to factor into the asking price.
Summary
- Sales stop when there is uncertainty: a defect with unknown scope and uncalculable repair cost.
- Active damp with an unidentified cause, missing or non-functioning electrical protection, and leaking roofs or risers are the most common deal-breakers.
- Worn windows, old floors or finishes are usually handled with a price reduction if the repair cost is well-defined.
- Buyers measure defects with a moisture meter, electrical inspection report, thermal camera and pressure test—not by feel.
- You should have documentation and a technical audit ready before offering units for sale.
What the buyer and their surveyor actually assess
A building survey does not answer whether the flat is old, but whether the repair cost is known and limited. The buyer's surveyor or technician inspects the flat and the building to draft a rough budget for necessary work and identify risks that fall outside that budget.
The buyer, and especially their lender, distinguish between three categories of findings:
- Safety and health – electricity, gas, mould, structural integrity.
- Incalculable risks – damp with an unidentified cause, hidden damage to pipework, roof condition.
- Cosmetic wear and tear – windows, floors, bathroom, decorations.
The first two categories can stop a sale; the third is usually reflected in the price. For an apartment building offered for sale by individual units, not only the flat but also the common building parts are assessed, as the buyer will bear their cost.
Damp: the most common reason buyers walk away
Damp will stop a sale if its cause is unclear, because the cost and scope of repair depend on identifying the cause. An old but dry basement is a far smaller problem than a fresh stain whose source is unknown.
How the buyer measures it:
- With a moisture meter at several heights on the wall to distinguish rising damp from condensation and from water ingress.
- With a thermal camera, which shows cold spots and thermal bridges.
- By inspecting the building's surroundings: gutters, foundation, ground level, state of waterproofing, basement.
- By asking about history: when the damp appeared, what has already been repaired.
What helps the sale: knowing the cause, having documented repairs and proving the problem has not returned. What harms it: covering a stain with fresh paint. The buyer will spot it and trust will fall on all other points of the inspection.
Electrics and earthing: safety cannot be negotiated by price
Missing or non-functioning electrical protection is a deal-breaker for most buyers and lenders, because it concerns personal safety and the scope of replacement cannot be estimated without inspection.
The buyer's surveyor typically examines the main switchboard, circuit breakers, the presence of residual-current devices, the condition of wiring (aluminium and textile-insulated cables are a warning sign) and whether the system is earthed at all. They will request a valid inspection report or have one prepared. If the report shows serious deficiencies, the buyer will either demand their removal before the sale or factor them into their budget and often lower their offer.
For the owner, it is most advantageous to have a current inspection done beforehand. Specific deficiencies can be repaired in advance and demonstrated, which is cheaper and faster than negotiating once the buyer sees only risk.
Windows, roof and pipes: where cost certainty matters
Windows are almost always handled through price negotiation; roof and water pipework are dealt with by price only if their condition and renewal plan are known.
Windows: the buyer checks tightness, frame condition, condensation and hardware function. Each faulty window is a budget item. However, work affecting the building's appearance may require approval from the homeowners' association and must comply with the Building Act (Czech Republic Act No. 283/2021 Coll.), so verify replacement before sale in advance.
Roof: signs of leaks on ceilings and timberwork indicate the problem may be common, not confined to one unit. Without knowledge of its extent, it becomes an incalculable risk.
Pipework: the buyer tests pressure and drainage, looks for signs of leaks and asks about the material of water risers. Risers are a common building part, so they are assessed with regard to future costs for all owners.
Deal-breaker or price reduction? A comparison by defect type
What matters is whether the defect is a safety issue or of unknown scope (a deal-breaker), or whether it can be costed (a price reduction). The following table is indicative; the actual outcome depends on the buyer, lender and condition of the whole building.
| Area | More likely to stop the sale | More likely to be handled by price |
|---|---|---|
| Damp | Active, cause unknown, mould | Cause identified, repaired and documented |
| Electrics and earthing | Protection missing, inspection report with serious defects | Outdated switchboard with clear replacement cost |
| Windows | Usually not | Wear and tear, lower thermal efficiency |
| Roof | Leaks of unknown extent | Planned, documented and costed repair |
| Pipework | Repeated failures, unknown condition of risers | Older but functional pipework |
The legal framework is straightforward: under Section 2161 of the Civil Code (Czech Republic Act No. 89/2012 Coll.), the seller is responsible for the goods having agreed and customary properties when transferred; in case of defects, the buyer acquires rights under Section 2106 of the same Act. Defects you have expressly informed the buyer about are therefore better than defects the buyer discovers themselves after purchase.
How to prepare for the survey before the buyer arrives
The cheapest approach is to find and disclose the defect first yourself. The buyer then negotiates not with the unknown but with a documented condition.
- Have an electrical inspection carried out and correct any serious deficiencies.
- Identify the cause of any damp stain and document the repair with photographs and invoices.
- Check the roof, risers and gutters and establish what has been repaired and what is planned.
- For windows and finishes, prepare a cost estimate so they can be factored into negotiations.
- Assemble a folder: inspections, repair certificates, condition description, maintenance plan.
Technical condition also affects how much more a building can sell for by individual units than as a whole; the typical difference is +20–40%, though the exact figure will only be determined by a feasibility study. Defects that are not costed reduce this potential. Further information can be found in the blog and frequently asked questions.
What to do now
Prepare documentation on technical condition and have an independent assessment of which defects will affect your property's price.
- Gather inspections, building documentation, repair certificates and records of failures.
- Note down areas with damp, leaks and repeated breakdowns.
- Consider the paid Audit and Plan, deliverable within six weeks, which combines technical, legal and sales data into a single document.